Time Oil Bulk Terminal

3 Results

Sort:

Comment From: Arthur Day

8/18/20 @ 4:56 PM
I am a near-neighbor of the project. I have three comments regarding the documents that I have reviewed:

1) DNR Waterway Authorization: The documents reference the DNR Waterway Use Authorization 20-A10919, which was initiated in 1997 and was renewabl...

2) Surface water management. In the SEPA checklist, it is stated that after the cleanup, approximately 80% of the land will be covered with impermeable surfaces. It is further stated that stormwater management will be required for the site, but completely defers this action to a future development. However, the overall cleanup action is supposed to be independent of future proposals.

3) Wildlife. Herons make use of the TOC dock and some surrounding areas during their pre-nesting period. This should be taken into account in scheduling activities on the site.
No attachments

Comment From: FRANCINE WALSH

8/17/20 @ 11:41 AM
I oppose the fact that they are trying to cut corners. The Ecology's chosen clean up is to excavate and remove the contamination NOT try to Encapsulate it. These sites have known TCE contamination which has been banned in most of the world since the ...
Respectfully,
Francine Walsh
No attachments

Comment From: Miller Myers

7/27/20 @ 1:27 AM
I'm concerned that the remediation work will result in toxic dust spreading through the Commodore Way neighborhood. What steps will be taken to prevent this from happening?
No attachments