Lower Skagit River Geographic Response Plan Update
The Washington Department of Ecology is updating the Lower Skagit River Geographic Response Plan (GRP). An important part of the update process is hearing from the people who live, work, and play in the GRP area. To facilitate this, a public comment period will be open from Friday 11/20/2026 to Sunday, 12/20/2026 at 5:00 PM.
The northern boundary of the Lower Skagit River planning area is just north of Burlington and Sedro-Woolley in Skagit County. The planning area extends to the east side of Sedro-Woolley to about river mile 25. The planning area includes Big Lake and Clear Lake on the east side of the planning area. The Skagit River runs to the west from Sedro-Woolley towards Mount Vernon where it turns southwest. At Fir Island (RM 8), the main Skagit River channel splits into multiple braided channels, including the North and South Forks, in the Skagit Delta. The Skagit Delta also includes several sloughs: Freshwater Slough, Tom Moore Slough, Fisher Slough, and Dry Slough. The western boundary of the planning area is inland about 1.5 miles from the Puget Sound shoreline at Skagit Bay. The southern boundary of the planning area includes a small portion of Snohomish County along the Interstate-5 corridor.
What are Geographic Response Plans?
Geographic Response Plans (GRPs) are used to guide early response actions in the event of an oil spill. Ecology develops and updates GRPs in collaboration with state, local and federal agencies and tribes. Each GRP is written for a specific area (for example a river, a lake, or section of Puget Sound) and includes tactical response strategies tailored to a particular shore or waterway at risk of injury from oil.
GRPs have two main objectives:
Identify sensitive natural, cultural or significant economic resources at risk of injury from oil spills.
Describe and prioritize response strategies in an effort to reduce injury to sensitive natural, cultural, and certain economic resources at risk from oil spills.
The Washington Department of Ecology is updating the Lower Skagit River Geographic Response Plan (GRP). An important part of the update process is hearing from the people who live, work, and play in the GRP area. To facilitate this, a public comment period will be open from Friday 11/20/2026 to Sunday, 12/20/2026 at 5:00 PM.
View the draft GRP sections here:
https://fortress.wa.gov/ecy/ezshare/sppr/preparedness/LowerSkagit2027Update/LSKARPublicCommentPeriodCoverPage.pdf
Description of the Planning Area
The northern boundary of the Lower Skagit River planning area is just north of Burlington and Sedro-Woolley in Skagit County. The planning area extends to the east side of Sedro-Woolley to about river mile 25. The planning area includes Big Lake and Clear Lake on the east side of the planning area. The Skagit River runs to the west from Sedro-Woolley towards Mount Vernon where it turns southwest. At Fir Island (RM 8), the main Skagit River channel splits into multiple braided channels, including the North and South Forks, in the Skagit Delta. The Skagit Delta also includes several sloughs: Freshwater Slough, Tom Moore Slough, Fisher Slough, and Dry Slough. The western boundary of the planning area is inland about 1.5 miles from the Puget Sound shoreline at Skagit Bay. The southern boundary of the planning area includes a small portion of Snohomish County along the Interstate-5 corridor.
What are Geographic Response Plans?
Geographic Response Plans (GRPs) are used to guide early response actions in the event of an oil spill. Ecology develops and updates GRPs in collaboration with state, local and federal agencies and tribes. Each GRP is written for a specific area (for example a river, a lake, or section of Puget Sound) and includes tactical response strategies tailored to a particular shore or waterway at risk of injury from oil.
GRPs have two main objectives:
More Information
Contact Information
*Indicates Required Fields